
Building and finishes practice
Building and finishing trades, one crew.
Services: Building construction · Brickwork · Plastering · Painting · Tiling · Ceilings and drywalling
Building envelope · PPP spotlight
Before hiring structural and civil contractors, trustees should verify the engineer's registration on the ECSA register. At handover, insist on signed design drawings and an engineer's completion or inspection certificate. The key standard here is Engineering Profession Act 46 of 2000.

Start with the six baseline checks that apply to every contractor. Because structural and civil is a major capital item, it also belongs in the 10-year maintenance plan.
Check each source’s current version before acting.
Important. Generic guidance for structural and civil. Confirm the current municipal rules for your site.
Trade directory planned for 2027. Businesses can register interest in the Dev 360 Trade Directory. Paid listings do not imply PPP vetting.
Through the PPP
Dev 360 can outsource structural & civil work to these participants, or introduce you.

Building and finishing trades, one crew.
Services: Building construction · Brickwork · Plastering · Painting · Tiling · Ceilings and drywalling

Architecture, planning and 3D design for Gauteng projects.
Services: Architectural design · Spatial planning · CAD documentation · 3D visualisation · Refurbishment and adaptive reuse · Engineering coordination
Not a guarantee of work. All participants
Yes, where structural design, rational design or certification is needed. Trustees should verify the engineer’s ECSA registration and relevant category, and follow applicable South African building requirements before repairs proceed.
For structural and civil work, obtain signed structural drawings, an engineer’s completion or inspection certificate, and test results with an as-built survey. Keep the technical file with scheme records and confirm South African municipal approvals where required.
Repairing cracks without finding their cause and allowing contractors to design structural work without an engineer can create repeat or unsafe work. In South Africa, trustees should obtain an appropriate engineering assessment and sign-off before accepting repairs.
Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.
Hiring roofing and waterproofing contractors? Trustees should check references, guarantees and whether structural work needs an engineer.
Hiring painting contractors? Trustees should check product suitability and data sheets, and how old paint will be prepared and disposed of.
Talk to Dev 360