How can a sectional title scheme plan rooftop solar?

A sectional title scheme should first establish whether the roof is common property, confirm the building’s electricity demand and condition, and agree how the system will be funded and maintained. Trustees should obtain technical advice, follow the scheme’s decision-making process and check connection rules with the municipality or distributor before work starts.

By the Dev 360 teamNovember 2026South African context
Apartment building common areas

Key takeaways

  • Confirm property boundaries and roof condition
  • Separate common loads from unit consumption
  • Follow scheme approval and procurement processes
  • Agree maintenance, insurance and cost allocation

Define the project before asking for prices

Identify what the scheme wants solar to do: reduce common-area consumption, support selected essential circuits, or provide power to individual units. Review bills and meter arrangements, then map distribution boards, roof access, shading, waterproofing and structural constraints. A site with several meters may need a different design from one with a central supply. Ask a qualified professional to explain the design options and limitations in writing before trustees compare proposals.

Use the scheme’s governance process

Trustees should establish whether the proposed work affects common property, exclusive-use areas or individual units, then confirm the required member approval under the scheme’s governing documents and applicable sectional title rules. Record the decision, scope, funding method and authority to contract. Obtain comparable quotations and check insurance, warranties, contractor credentials, safety arrangements and access requirements. The body corporate should not treat an informal discussion as approval for a material project.

Plan the connection and long-term upkeep

Ask the municipality or electricity distributor which application, registration, meter or inspection steps apply. The scheme should retain approved plans, commissioning documents, equipment details and maintenance instructions. Agree who monitors performance, cleans panels, responds to faults and pays for future repairs. Consider how costs and benefits are allocated between common-property use and individual consumption. Dev 360’s body corporate interventions can help trustees organise complex property decisions and delivery coordination.

Sources

Check each source’s current version before acting.

Short answers

Can trustees approve solar without owners?

The required decision depends on the scope, impact on common property and the scheme’s governing documents and applicable law. Trustees should obtain advice and follow the correct meeting and voting process before committing the body corporate.

Who owns panels installed on a scheme roof?

Ownership depends on the contract and project structure. The body corporate should state in writing who owns the equipment, who insures it, who maintains it and what happens if the service provider or agreement changes.

Can solar reduce every owner’s levy?

Not automatically. Savings depend on the system, tariffs, usage, financing and how the scheme allocates costs and benefits. Trustees should model the body corporate account and explain assumptions to owners.