Dev 360

Participants · Service line

Protective coatings and waterproofing

Dev 360 sources advanced protective coatings through Protective coatings supplier, the pan-African distribution licence holder for its range and a participant in Dev 360's Preferred Participation Panel (PPP). Property owners, bodies corporate and contractors get waterproofing, thermal and protective coatings for roofs, walls, concrete and masonry, with specification and application coordinated by Dev 360.

Maintenance worker inspecting the roof of a sectional title complex

At a glance

Is this right for you?

Best for
  • Roofs and walls with leaks or damp
  • Top-floor units that overheat
  • Facades and concrete that need longer-lasting protection
Not the right fit if
  • Structural defects that need an engineer first
  • Surfaces that have not been assessed
What you getSpecified coatings for roofs, walls, concrete and masonry, with application coordinated by Dev 360
How it is pricedWritten scope and quote in rand after a scoping conversation
WhereSouth Africa and Africa
Who deliversPPP coatings participant, coordinated by Dev 360

PPP participants in this service line

Who delivers it

Dev 360 capability
Building materials and coatings

Protective coatings supplier

Don't just cover the problem, solve it smarter.

Services: Waterproofing and water repellency · Rising-damp treatment · Stone protection · Timber protection · Masonry and exterior paints · Heat-reflective roof coatings · Photocatalytic mineral coating · Primers and cement additives · Cleaning and restoration

What this covers

Services in protective coatings and waterproofing

Protective coatings supplier

Waterproofing and water-repellent coatings

Coatings that repel water on roofs, walls and masonry, matched to each surface.

Protective coatings supplier

Thermal protection, cooling and insulation coatings

Reflective and insulating coatings that reduce heat gain through roofs and walls.

Protective coatings supplier

Functional and smart paints

Paints that add protective functions to the finish, for interiors and exteriors.

Protective coatings supplier

Protective treatments for concrete, masonry and stone

Treatments that protect concrete, brick and stone from water, staining and weathering.

Protective coatings supplier

Roof and wall protection

Protection systems for the roofs and facades of homes, complexes and commercial buildings.

Protective coatings supplier

Cleaning and restoration treatments

Treatments that clean and restore weathered surfaces before protection goes on.

When to use it

When clients bring this in

  • Roofs leak or walls stay damp
  • Top-floor units overheat
  • Facades or concrete are weathering
  • A repaint is planned

How Dev 360 delivers it

Outsourced with one point of contact

  1. Tell us the need

    Describe the work, the site and the timing.

  2. We confirm the fit

    Dev 360 checks the scope against the participant's services, coverage and availability.

  3. Scope in writing

    Scope, responsibilities, cost in rand and who you contract with are agreed before work starts.

  4. Delivery and handover

    Dev 360 coordinates, reports progress and hands over the documents.

Read before you appoint

Hiring checklists and guides

Short answers

When should a scheme waterproof rather than repair?

Waterproof when leaks or damp return after spot repairs, or the maintenance plan shows roof or facade protection nearing its end. In a South African scheme, fix structural defects first; Dev 360 coordinates Protective coatings supplier’s coating scope and trade sequencing.

Do cooling coatings help top-floor units?

They can. Protective coatings supplier’s reflective and insulating coatings reduce heat gain through roofs and walls, although the effect depends on the building. Dev 360 can coordinate the coating scope; request product data and a measured comparison where possible.

How long does a coating last?

No single lifespan applies to a Protective coatings supplier coating; the product, surface and application all matter. In South Africa, ask for the warranty, its conditions and maintenance requirements in writing; Dev 360 coordinates the scoped work through handover.

Who applies the coatings?

Trained applicators apply the coatings, while Dev 360 coordinates Protective coatings supplier’s work with other trades if repairs are needed first. Confirm the surface assessment, application method and responsibilities in the written scope before work begins.

Should roof work come from the reserve fund or a special levy?

Planned roof work belongs in the South African scheme’s maintenance plan and should be funded from the reserve. A special levy may be needed for unplanned or underfunded work under the scheme rules; Dev 360 can coordinate Protective coatings supplier’s coating scope after approvals.

Other service lines

Capability categories

Construction, maintenance and trades

Electrical capability, Plumbing and maintenance, Building and finishes practice, Ultimate Concepts and Solutions

Capability categories

Finance, legal and insurance

Community scheme finance capability, Legal services practice, Financial planning capability

Delivered by Dev 360

Digital services

Website design, social media, branding, SEO and AEO, CRM, AI and 3D visualisation, delivered by Dev 360 for clients and participants.

Answers to the questions people ask before they appoint.

Request a quote

Tell us what you need

A few lines is enough.

Every enquiry is read by a person and answered by email.

We use these details to respond to your enquiry. Please do not include ID numbers, banking, health or other sensitive personal information. Our service providers, some outside South Africa, process it for us under agreements that protect it. See the privacy policy.

Get in touch