All 43 industry spotlights
Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.
Security & access · PPP spotlight
Before hiring IT and network installers, trustees should require POPIA operator due diligence and check ICASA licensing only where the provider runs a network service. At handover, insist on a network as-built, configuration backup and acceptance report. The key standard here is POPIA sections 19 to 21.

Start with the six baseline checks that apply to every contractor.
Check each source’s current version before acting.
Important. Generic guidance for IT and network infrastructure. Confirm the current municipal rules for your site.
Trade directory planned for 2027. Businesses can register interest in the Dev 360 Trade Directory. Paid listings do not imply PPP vetting.
Usually, ordinary Wi-Fi installation does not need ICASA approval. Licensing applies where a provider operates an electronic communications service, so South African schemes should check the provider’s role rather than assume every installation needs a licence.
For IT handover, collect an as-built installation plan, configuration backup, acceptance report, security schedule and administrator credentials. Ensure the scheme controls its own access details and retain the records; POPIA applies where personal information is processed.
A vendor keeping the only administrator passwords and the absence of a configuration backup can leave a scheme unable to manage its own system. Trustees should secure access and backup arrangements, and check POPIA safeguards where South African residents’ information is involved.
Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.
Hiring security companies? Trustees should verify the company and every officer are registered with PSiRA.
What sectional title trustees should check before hiring for electronic security: registrations, certificates, rules, handover documents and…
Talk to Dev 360