What should a business check before installing rooftop solar?
A practical commercial rooftop solar checklist for South African businesses, covering roof capacity, electricity use, approvals, connection and contracts.
Energy and utilities
A business energy audit reviews how, when and where electricity is used, then identifies practical ways to reduce waste, manage demand and improve resilience. It should combine bills and meter data with a site inspection, operating schedules and equipment checks. Recommendations should be prioritised by cost, disruption, risk and expected benefit, then tracked against a baseline rather than assumed savings.

Collect electricity bills, tariff information, meter details, operating schedules, generator logs and records of recent equipment changes. If interval data is available, compare consumption and demand by time of day and season. Note production or occupancy changes that affect comparisons. A clean baseline prevents temporary operational differences from being mistaken for energy savings and helps the audit identify when and where consumption is occurring.
Review lighting, heating and cooling, pumps, compressed air, refrigeration, motors, controls and standby equipment. Look for equipment left running, poor maintenance, leaks, simultaneous heating and cooling, and schedules that do not match occupancy. Ask staff about comfort, process constraints and recurring faults. Recommendations should distinguish low-cost operational changes from equipment upgrades and identify the professional input needed for electrical, mechanical or building work.
Rank actions by safety, energy impact, implementation cost, payback assumptions, operational disruption and maintenance needs. Check tariff and demand-charge effects rather than comparing only total kilowatt-hours. After implementation, compare meter data with the baseline and document changes in occupancy, production or weather. An audit can inform a wider solar or storage decision, but efficiency measures may change the system size required. Dev 360 coordinates commercial projects through its turnkey project service.
Check each source’s current version before acting.
The interval depends on changes in operations, equipment, tariffs and performance. Review usage regularly and commission a new assessment after significant changes or when the existing baseline no longer reflects the site.
It can and should record the applicable tariff and demand charges where these are relevant. Confirm the scope with the auditor and check the current tariff with the electricity supplier.
An audit can estimate opportunities using stated assumptions, but actual savings depend on implementation, operating behaviour and changing conditions. Track results against a clear baseline rather than treating estimates as guaranteed outcomes.
A practical commercial rooftop solar checklist for South African businesses, covering roof capacity, electricity use, approvals, connection and contracts.
Battery storage sizing basics for South African buildings: estimate critical loads, backup duration, usable capacity, inverter power and operating needs.
Who pays for generators, inverters, batteries and water tanks in a sectional title complex, and which resolutions PMR 29 requires before installation.
Talk to Dev 360