Commercial turnkey projects
Commercial fit-outs, refurbishments and new builds managed from brief to handover through one accountable point of contact in Gauteng.
Case study · Healthcare
Dev 360 is planning a five-phase upgrade of a private hospital that must keep treating patients throughout. Working with a specialist design studio from the PPP, we put together a turnkey delivery approach covering external works, ward refurbishment, a new operating theatre and the public and consultation areas, with each phase programmed so clinical areas keep running.

The challenge
The hospital needed a substantial upgrade: a new entrance and parking, refurbished wards, a new operating theatre and a modern public face. It also had to stay open. Every phase had to protect patients, staff and visitors from dust, noise and disruption, and some existing spaces might not meet current dimensional rules once opened up.
Our approach
External works first, then ward relocations and refurbishment in two stages, then the new operating theatre with its mechanical and medical gas installations, and finally the public and consultation areas.
Architecture, quantity surveying and project management, and mechanical, electrical and structural engineering, coordinated by Dev 360 as the single point of contact.
Each phase is separately programmed, and phases can overlap where planning allows, so wards and theatres move rather than close.
Procurement, construction oversight and quality checks sit with Dev 360, so the hospital deals with one accountable team instead of many contractors.
Where it stands. The scope and pricing are being finalised with the client. We will publish outcomes only once work is complete and the client has approved publication.
Check each source’s current version before acting.
Yes. A hospital can remain open during a major refurbishment if the work is phased and patients move to finished or temporary space before each phase begins. Dev 360's plan includes controls for dust, noise and access around active clinical areas.
Registered architects and engineers design a hospital upgrade, while Dev 360 coordinates the professionals, procurement and construction as one point of contact. Each appointed professional remains responsible for their own design work.
Commercial fit-outs, refurbishments and new builds managed from brief to handover through one accountable point of contact in Gauteng.
Design-led residential, hospitality and experience-space work through Design Studio, by a Dev 360 Associate: proposals, interiors and 3D visualisation

A multi-site pharmacy and healing centre: floor plans digitised into a 3D model, plumbing and electrical audits, and a fix-first plan for its…
Answers to the questions people ask before they appoint.
What a turnkey commercial project includes, from brief, feasibility and design coordination to appointments, construction oversight and handover.
How 3D visualisation helps owners, trustees and developers decide before construction: fewer changes, faster approvals and better buy-in.
What to prepare before a commercial project: a written brief, budget range, site and building information and the approvals likely to be needed.
Discuss a similar project
A few lines is enough.
Every enquiry is read by a person and answered by email.
Talk to Dev 360