Dev 360

Participants · Service line

Smart metering and utility billing

Dev 360 outsources smart metering and utility billing to Utility metering capability, a national participant in its Preferred Participation Panel (PPP). Bodies corporate, landlords and developers get prepaid or smart sub-meters for electricity, water and gas, STS vending, automated billing and arrears recovery, with Dev 360 scoping and coordinating the rollout.

Technician checking a prepaid meter cabinet and access-control panel at a sectional title complex

At a glance

Is this right for you?

Best for
  • Schemes where the municipal bill exceeds what owners repay
  • Landlords and developers that need unit-level metering
  • Trustees dealing with utility arrears or tampering
Not the right fit if
  • Properties where the conduct rules do not allow sub-metering
  • Buildings already on a working smart-metering system
What you getPrepaid or smart meters, STS vending, automated billing and arrears recovery, rolled out by a PPP specialist
How it is pricedWritten scope and quote in rand after a scoping conversation
WhereSouth Africa
Who deliversPPP metering specialist, coordinated by Dev 360

PPP participants in this service line

Who delivers it

Dev 360 capability
Technology and metering

Utility metering capability

Smarter metering, billing automation and usage monitoring.

Services: Prepaid and smart sub-metering · Automated billing and arrears recovery · STS electricity vending · Tariff and time-of-use management · Monitoring and revenue protection · Remote utility control · Resident communication

What this covers

Services in smart metering and utility billing

Utility metering capability

Prepaid electricity sub-metering

A prepaid meter per unit, so each owner or tenant pays for what they use and the scheme stops carrying the shortfall.

Utility metering capability

Smart electricity, water and gas meters

Meters that report readings remotely, supporting more accurate reading and reconciliation and manual meter rounds.

Utility metering capability

STS-compliant vending

Token vending on the Standard Transfer Specification (STS), the open standard for prepaid meters in South Africa.

Utility metering capability

Automated billing, collections and arrears recovery

Bills, statements and collections run automatically, with arrears recovery built into the vending.

Utility metering capability

Time-of-use and multi-structure tariffs

Tariffs that follow the municipal structure, including time-of-use where it applies.

Utility metering capability

Remote connection and disconnection

Connecting or disconnecting supply remotely, within the scheme's rules and the law.

Utility metering capability

Tamper, bypass and leak alerts with analytics

Alerts for tampering, bypassing and water leaks, with dashboards that show consumption and losses.

When to use it

When clients bring this in

  • Utility recoveries do not cover the municipal bill
  • Units share a bulk meter
  • Utility arrears keep growing
  • Water losses or tampering are suspected

How Dev 360 delivers it

Outsourced with one point of contact

  1. Tell us the need

    Describe the work, the site and the timing.

  2. We confirm the fit

    Dev 360 checks the scope against the participant's services, coverage and availability.

  3. Scope in writing

    Scope, responsibilities, cost in rand and who you contract with are agreed before work starts.

  4. Delivery and handover

    Dev 360 coordinates, reports progress and hands over the documents.

Read before you appoint

Hiring checklists and guides

Short answers

Why sub-meter a sectional title scheme?

Unit-level meters charge each owner or tenant for their measured use, making losses visible and reducing the gap between a scheme's municipal bill and recovery. Utility metering capability provides this service for South African bodies corporate and other property owners.

What is STS?

STS is the Standard Transfer Specification, an open standard (IEC 62055) for prepaid meter tokens. In South Africa, STS-compliant meters and vending allow tokens to be purchased through common channels rather than a single meter-specific system.

Can prepaid metering reduce utility arrears?

Yes, prepaid metering can stop new utility debt accumulating because supply is paid for before use. It does not clear existing arrears, which still need a collection plan; Utility metering capability supports metering and billing for South African schemes.

What approvals does a scheme need?

Trustees approve the metering project and tariffs, while owners approve them where the scheme's rules require it. Tariffs should follow the municipal structure, and POPIA governs how the scheme handles consumption data.

Does Dev 360 install the meters?

No. Utility metering capability supplies and supports the meters, while Dev 360 scopes the rollout, coordinates installation with the electrical trade and reports to trustees. The service line is for South African schemes, with delivery responsibilities agreed in scope.

Other service lines

Capability categories

Construction, maintenance and trades

Electrical capability, Plumbing and maintenance, Building and finishes practice, Ultimate Concepts and Solutions

Capability categories

Finance, legal and insurance

Community scheme finance capability, Legal services practice, Financial planning capability

Delivered by Dev 360

Digital services

Website design, social media, branding, SEO and AEO, CRM, AI and 3D visualisation, delivered by Dev 360 for clients and participants.

Answers to the questions people ask before they appoint.

Request a quote

Tell us what you need

A few lines is enough.

Every enquiry is read by a person and answered by email.

We use these details to respond to your enquiry. Please do not include ID numbers, banking, health or other sensitive personal information. Our service providers, some outside South Africa, process it for us under agreements that protect it. See the privacy policy.

Get in touch