E-commerce and online sales
Online shops that check out reliably, sync stock and bring customers back.
Case study · Retail health and wellness
A specialist pharmacy and healing-centre business with two stores wanted to revamp its building and grow online. Dev 360 digitised the floor plans into a three-floor model, audited the plumbing and electrical installations, reviewed its online shop and customer data, and proposed a fix-first plan: repair what loses customers today, then scale.

The challenge
The building combined retail, consulting and wellness spaces over three floors, and the business wanted a revamp that would work for customers and practitioners. At the same time, its online shop was losing sales at checkout, its customer data sat in disconnected systems and its online listings did not match.
Our approach
We traced the drawings into a measured three-floor model, mapped the retail, health and wellness zones, and produced structured data ready for the design team's modelling software.
Plumbing and electrical audits identified compliance and housekeeping items to resolve before, or as part of, the revamp.
A review of the online shop, payments, customer data, listings and messaging, with the fixes ranked by how many customers each one loses.
Repair checkout, separate payment flows where products need it, connect point-of-sale, shop and messaging data, then add reorder reminders and a practitioner platform.
Where it stands. The revamp and digital proposal is with the client. Measured results will be published only after implementation and with the client's approval.
Check each source’s current version before acting.
Digitised floor plans create a measured model for design and pricing. The model shows how space is used, exposes errors in old drawings and gives the architect and contractors a reliable base, as in Dev 360's revamp assessment.
Fix first, then scale means repairing issues that are losing customers now, such as a failing checkout or mismatched listings, before investing in growth. In Dev 360's case study, the proposed sequence aimed to make later growth spend more effective.
Online shops that check out reliably, sync stock and bring customers back.
Design proposals, floor-plan digitisation and photo-real visualisation with Design Studio.

How Dev 360 is planning a five-phase upgrade of a working private hospital: external works, wards, a new theatre and public areas, without stopping…
Answers to the questions people ask before they appoint.
What a turnkey commercial project includes, from brief, feasibility and design coordination to appointments, construction oversight and handover.
What to prepare before a commercial project: a written brief, budget range, site and building information and the approvals likely to be needed.
Turnkey delivery versus appointing separate contractors: accountability, control, risk, cost and programme, and which suits which kind of project.
Discuss a similar project
A few lines is enough.
Every enquiry is read by a person and answered by email.
Talk to Dev 360