All 43 industry spotlights
Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.
Grounds & amenities · PPP spotlight
Before hiring landscapers, trustees should check water restrictions, irrigation rules and invasive-species obligations. At handover, insist on an irrigation test, zone plan and plant schedule. The key standard here is Municipal water by-laws. A common mistake: irrigating during restrictions.

Start with the six baseline checks that apply to every contractor.
Check each source’s current version before acting.
Important. Generic guidance for landscaping and irrigation. Confirm the current municipal rules for your site.
Trade directory planned for 2027. Businesses can register interest in the Dev 360 Trade Directory. Paid listings do not imply PPP vetting.
Through the PPP
Dev 360 can outsource landscaping & irrigation work to these participants, or introduce you.
Not a guarantee of work. All participants
Yes. A body corporate, as a landowner of common property, has duties to control listed invasive species under South Africa’s NEM:BA regulations. Trustees should identify listed plants and arrange appropriate control rather than allowing them to spread.
The landscaping handover should include an irrigation test, a zone plan with controller settings, and a plant schedule showing no prohibited species. Keep the records with the scheme and check South African municipal water restrictions before operating irrigation.
Irrigating during water restrictions and planting listed invasive species are avoidable errors. Trustees should check their municipality’s water by-laws and the NEM:BA rules before approving planting or irrigation at a South African complex.
Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.
Hiring pool contractors? Trustees should check barrier requirements, municipal approval and electrical work.
Hiring cleaning contractors? Trustees should check COIDA registration and compliance with contract-cleaning wage rules.
Talk to Dev 360