Construction consortium agreement checklist (South Africa)
What a South African construction consortium or JV agreement must define: roles, scope split, risk, money, decisions, IP, exit, and CIDB grading rules.
Tenders, B-BBEE and inclusion
Small firms can win larger public work together when every member does real, priced work. Under the Preferential Procurement Regulations, 2022, each tender sets its own specific goals and the proof required, and for construction the CIDB lets joint-venture partners combine their grading, provided the lead partner is no more than one grade below the advertised grade.

The Preferential Procurement Regulations, 2022 took effect on 16 January 2023. Instead of one national B-BBEE scorecard, each organ of state sets specific goals in its own policy, drawn from section 2(1)(d) of the Preferential Procurement Policy Framework Act. These may include contracting with people historically disadvantaged on the basis of race, gender and disability. The tender document states the goals, the points and the proof.
For construction, every member of a joint venture must be registered with the CIDB in its own right. The CIDB calculator combines the members’ data to give the joint venture a grading designation. The lead partner must be registered no lower than one level below the advertised grade: for a 7GB tender, the lead needs 6GB or higher.
The strongest consortia cover the full cycle of the work: inspect, design, build, electrify and protect. Agree work-package boundaries before bidding, so members with overlapping services do not compete for the same scope.
Dev 360’s planned SA Tender Consortium helps B-BBEE-compliant and disability-owned enterprises prepare and bid together with PPP participants. No award is promised, and each member keeps real ownership, control and management of its own business.
See also: The PPP credentials register.
Check each source’s current version before acting.
Specific goals are the preference criteria an organ of state sets under the Preferential Procurement Regulations, 2022, such as ownership by black people, women or people with disabilities. Each tender states its goals, points and the proof required.
Yes. The CIDB calculator combines joint-venture members’ data into one grading designation, but the lead partner must be no more than one grade below the advertised grade, and every member must be registered.
No, if every member does real, priced work and carries matching risk. Passive participation to gain points is fronting, which is an offence under the B-BBEE Act.
What a South African construction consortium or JV agreement must define: roles, scope split, risk, money, decisions, IP, exit, and CIDB grading rules.
The documents a disability-owned SME needs for South African tenders: CSD, tax PIN, B-BBEE evidence, CIDB, COIDA, SBD forms and proof of disability goals.
Why small South African contractors struggle to reach quality work alone, and how panels, teaming and mentorship help them grow without guaranteed promises.
Talk to Dev 360